海外电力承包工程的风险管理及防范措施

2026/1/22 15:08:29

龙源期刊网 http://www.qikan.com.cn

海外电力承包工程的风险管理及防范措施

作者:任果

来源:《价值工程》2014年第20期

摘要: 工程承包风险管理能力的高低直接影响着我国的海外电力承包工程的经济利益,工程承包单位一定要创建合理的机构用来评估、检测承包风险,不仅如此,企业还要加大风险管理的力度,提升企业自身抵抗风险的本领,确保企业能够实现高收益。下面文章中主要讲述了四川电力设计咨询有限责任公司在海外执行某电力总承包项目过程中的实际情况,分析海外电力工程承包风险的管理与防范措施。

Abstract: Project contracting risk management capability directly affects the economic interests of China's overseas power contracted projects. Project contractors must create reasonable institution to evaluate and test contracting risk, in addition to these, enterprises should strengthen risk management, improve enterprise's own ability to resist risks, ensure that enterprises can achieve high yield. The following article mainly introduces the actual situation of Sichuan Electric Power Design & Consulting Co., Ltd. in the process of general contracting project in overseas, analyzes management and preventive measures of overseas power project contracting risk. 关键词: 海外;电力工程;风险管理

Key words: overseas;power project;risk management

中图分类号:F426 文献标识码:A 文章编号:1006-4311(2014)20-0090-02 0 引言

近年来,我国的工程企业逐渐趋向于海外发展,对于海外发展的企业,其自身的经济效益、在本行业内的影响均受到自身风险管理能力的影响。然而,目前的海外电力总承包工程包含的项目较为繁杂,项目之间有很大不同、竞争激烈,谈判签订的合同所用资金数额较大,这一切风险大部分都由承包商承担。近几年来,四川电力设计咨询有限责任公司积极进行转型升级,构建工程公司,承接了印度、科特迪瓦、印尼以及塞拉利昂等国家的电力工程设计和总承包项目。随着业务的不断发展,企业要加大风险管理的力度,提升企业自身抵抗风险的本领,确保企业能够实现高收益。

在项目的实际操作层面,面临许多问题,比如合同签订过程中的风险,当地政治环境风险,设计施工技术风险以及上级业主的经济风险等,为提高项目管理水平,必须做好风险分析和风险防范。

1 海外电力承包工程所存在的风险分析


海外电力承包工程的风险管理及防范措施.doc 将本文的Word文档下载到电脑
搜索更多关于: 海外电力承包工程的风险管理及防范措施 的文档
相关推荐
相关阅读
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 10

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xuecool-com QQ:370150219