QUALITY PLAN 质量计划

2026/4/28 4:37:47

The PQP may also be used by the sub-contractors or other companies as a guideline in the event there would not be a developed PQP available within their organization.

2 Project Details 2.1 Project Overview 2.2 Organization Chart 2.3 Roles and Responsibility

2.4 Distribution of Project Quality Plan 2.4.1 Purpose 2.4.2 Scope 2.4.3 Responsibility 2.4.4 Procedure

2.1 Project Overview

The Works under Contract C01 comprise the construction and completion of twelve (12) elevated station, approximately 11.4km of elevated MRT viaduct. Associated works include the construction of underpass, demolition of existing fly over and interface with one existing subway station.

The rail viaduct generally consists of single-track, double track and triple-track viaducts. The rail viaduct structure generally consists of piers, and pre-cast segmental post-tensioned beams spanning up to 37.5m. Bearings and expansion joints are required at the end of these continuous decks.Deep foundation elements forming the foundations are typically barrettes and bored piles.

The casting yard will be set up for the precast structural elements such as viaduct segment, precast crossbeam shell, pre-stressed station I beam, precast parapet wall and etc.

The track-form comprises a slab-track system . The Contractor shall undertake waterproofing as required prior to installation of the slab-track system by the System-wide Contractors (SWCs) and supply and install sockets in the viaduct decks for anchorage of the slab-track.

2.2 Organization Chart

The site organization chart is attached on the following page.

2.3 Roles and Responsibility Project Director

? To direct overall project mission.

? To appoint project operation team to ensure timely completion of project.

? To provide advice on human resources specialized skills, technological and financial resources essential to the successful completion of works.

? To assume ultimate responsibility for project and QAQC management and performance.

Project Manager

? To undertake overall planning and control of the project in relation to all site management. ? To formulate and implement systems and policies for efficient site management.

? To expedite progress within the constraints of available resources if the works are found lagged behind the programme of works.

? To carry out general management of the site that includes daily correspondences. ? To act as chairman of the safety committee.

? To attend progress meetings with CLIENT, consultant and Sub-Con.

? To liaise with the client and the consultant and to take instructions from the client. ? To ensure environmental, safety and health policies are in place.

? To review and approve method statements and risk assessments which are prepared by professional engineer, Safety Officer and sub-contractors of special trades. ? To organize and control site meetings with the sub-contractors.

? To liaise with the sub-contractors regarding progress, quality of works, and the provision of adequate resources to carry out their respective scope of works in a timely and workmanlike manner.

? To ensure that the permanent works are constructed in compliance with the consultant's specified codes in its entity.

Deputy Project Manager /Construction Manager

? To organize and control site meetings with the sub-contractors. ? To check the sufficiency of information for construction.

? To liaise with the client and consultant regarding discrepancy of drawings and specifications.


QUALITY PLAN 质量计划.doc 将本文的Word文档下载到电脑
搜索更多关于: QUALITY PLAN 质量计划 的文档
相关推荐
相关阅读
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 10

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xuecool-com QQ:370150219