新加坡金字塔公司项目管理模式英文版(7)

2026/1/27 18:30:58

STANDARD OPERATING PROCEDURES

SOP-FA-00 Ref. No.

SOP-FA-01 SOP-FA-02

TRAINING Contents On-the-Job Training

External Training for General Labourers

PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP – FA- 01 ( Page 1 / 1 ) WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA NA FACILITIES /INSPECTION INSTRUMENT : NA NECESSARY RECORD Training record SPECIAL REQUIREMENTS : NA WORK TITLE : On –the –Job Training for general labourers APPROVED BY : Head, Control Dept REVISION : A CHECKED BY : PROJECT MANAGER EFFECTIVE DATA : 18/10/97 REFERENCE STANDARDS/ CODES & QUALITY PLAN : To comply with the MOL ‘s requirement ENVIRNMENT CONTROLS : NA FREQUENCY For general labourers without experience SAFETY & HEALTH REQUIREMENTS : Standard PPE RESPOSIBILITY Assistant Foreman Engineer Project Manager Foreman Checker Trade Worker WORK PROCEDURE CHECKING METHOD 1.General labourers are employed to site 2.Project Manager will determined the trade they are suitable for training e.g carpentry ,bricklaying , steel –bending ,plastering etc,,, 3.Gerneral labourers are assigned to do On –the-Job Training under guidance if relevant foreman 4.Foreman are to update the Project Manager on their performance 5.PM is to inform Training section at HQ regarding their performance 6.Training section is to update the general labourers record NA NA NA NA NA Training record ( as attached ) NA NA NA NA NA NA P P C P P P Subcon C P File : FA-01 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK Others REMEDIAL MEASURE PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP – FA- 02 ( Page 1 / 2 ) WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA NA FACILITIES /INSPECTION INSTRUMENT : NA NECESSARY RECORD 1.Application for upgrading course 2. Application for National Construction Trade Test SPECIAL REQUIREMENTS : NA WORK TITLE : External training for general labourers APPROVED BY : Head, Control Dept REVISION : A CHECKED BY : PROJECT MANAGER EFFECTIVE DATA : 18/10/97 REFERENCE STANDARDS/ CODES & QUALITY PLAN : To comply with the MOL ‘s requirement ENVIRNMENT CONTROLS : NA FREQUENCY To the Training Programme SAFETY & HEALTH REQUIREMENTS : Standard PPE RESPOSIBILITY Assistant Foreman Engineer Project Manager Foreman Checker Trade Worker WORK PROCEDURE CHECKING METHOD 1.PM to recommend to training section, HQ the general laboures who will undergo trade test in trades they were training in during On –the-Job training e,g bending , plastering , etc. 2.Selected candidates are to attend a familiarsation course conducted by ( CITI’s representative at site . Candidates are selected by Training Section test . 3.Feedback from course conductor on whether candidates are ready to sit for trade test 4.If not ready, retain candidates from items ( 2 ) 5.If ready, apply to CITI for test date NA Fill in application for upgrading course NA NA Fill in application for national construction trade test NA NA NA NA NA P C Subcon File : FA-02 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK Others P P P P REMEDIAL MEASURE PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP – FA- 02 ( Page 2 / 2 ) WORK TITLE : External training for general labourers APPROVED BY : Head, Control Dept REVISION : A CHECKED BY : PROJECT MANAGER EFFECTIVE DATA : 18/10/97 RESPOSIBILITY Assistant Foreman Engineer Project Manager Foreman Checker Trade Worker WORK PROCEDURE CHECKING METHOD Subcon Others P C P REMEDIAL MEASURE 6.Upon confirmation of test date, Training Section, HQ is to inform Inform PM by memo NA C PM and the candidates 7.On the test date, PM will release candidates for test NA NA P 8.Upon passing, CITI will issue trade certificates NA NA C File : FA-02 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK


新加坡金字塔公司项目管理模式英文版(7).doc 将本文的Word文档下载到电脑
搜索更多关于: 新加坡金字塔公司项目管理模式英文版(7) 的文档
相关推荐
相关阅读
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 10

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xuecool-com QQ:370150219