BPC Lemongrass Project in Malaysia —Piping construction method statement

HAZARD ANALYSIS PLAN DATE :4 Dec., 2014 CONTRACTOR :CCEM JOB SITE :BASF Lemongrass Project SPECIFICATION: Sub-Con Engineer Name: Approved By: Name Signature Date Activities 2. NDE thEquipment Used For Job 1 Welding machine 2 Crane 3 Disc grinder 4 Type cutter 5 Chain block Potential Risks & Hazards -Radiation injury -Radiation contamination PPE Required For The Job Harness/Line Safety Helmet Safety Shoes Goggles Face Shield Ear Plugs RHC A A Risk/Hazard (RHC): √ √ √ √ √ Classification √ √ √ √ √ √ Gas Mask Gloves Luminous Vest Dust Mask Coveralls Others Major risks/hazards-A Minor risks/hazards-B □ Risk Control Measures -Work permit of NDE application one day in-advance -Specialized personnel to perform NDE better in mid-night -Timely inform the related company before NDE -Warning area with striking warning sign -Provide safety supervisor -Non-related person out of concerned area -Work application 24 hours ahead -Immediately inform TEC if any accident happens -γ-ray shall be prohibited Page 49 of 55

BPC Lemongrass Project in Malaysia —Piping construction method statement

HAZARD ANALYSIS PLAN DATE :4 Dec., 2014 CONTRACTOR :CCEM JOB SITE :BASF Lemongrass Project SPECIFICATION: Sub-Con Engineer Name: Approved By: Name Signature Date Activities 3. Valve test thEquipment Used For Job 1 Welding machine 2 Crane 3 Disc grinder 4 Type cutter 5 Chain block Potential Risks & Hazards PPE Required For The Job Harness/Line Safety Helmet Safety Shoes Goggles Face Shield Ear Plugs RHC B B B Risk/Hazard (RHC): √ √ √ √ √ Classification √ √ √ √ √ √ Gas Mask Gloves Luminous Vest Dust Mask Coveralls Others Major risks/hazards-A Minor risks/hazards-B □ Risk Control Measures -Warning area closed for valve test -Transportation should be careful - Observation gauge, don‘t over-pressure -When discharge water, don‘t stay at the discharge point - All personnel tightening bolts & nuts and checking leak at flange must wear face shield. -Injury caused by discharged flush water -Destruction caused by over-pressure -Pricking&hit injury 4. Cleaning -Corrosion injury caused by chemical material -Contamination caused by waste chemical liquid A B -Proper storage and issuing of chemical -Proper selection of PPE as per acid cleaning paste Page 50 of 55


巴斯夫工艺管道施工方案.doc 将本文的Word文档下载到电脑
搜索更多关于: 巴斯夫工艺管道施工方案 的文档
相关推荐
相关阅读
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 10

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xuecool-com QQ:370150219