Procedure for Cleaning,Flushing,Gauging and Hydro Testing of Pipelines

2026/4/24 2:37:51

East-west Gas Pipeline Project Construction Procedure for Cleaning, Gauging And Hydro testing of Pipelines Rev.: A1 China Petroleum Pipeline Bureau(CPP) Document No.: EWPL00-COS-PR-0014 10.0 QUALITY CONTROL The Contractor shall operate a Quality System meeting the requirements of relevant part of ISO 9002.Contractor shall provide documents such as plans, procedures, instructions, etc. for the accomplishment of all works covered in this specification to provide the required quality. Specific adherence to the guidelines set down in ISO 902 series documentation shall be detailed out by the Contractor and shall be subject to review and approval by Company. Company reserves the right to undertake such audit as deemed necessary to assess the effectiveness of the Contractor?s quality system.

Page 41 of 56

East-west Gas Pipeline Project Construction Procedure for Cleaning, Gauging And Hydro testing of Pipelines Rev.: A1 China Petroleum Pipeline Bureau(CPP) Document No.: EWPL00-COS-PR-0014 Annexure:Clearance for Hydrostatic test of Main Line Section: Joint no from __________________ To ______________________ OD (mm)

Wall Thk ( mm) Min: Max: Min: ID (mm) Max: Material: Length (Kms) Volume (M3) API 5L Gr. X70 Wall (mm) 17.2 20.7 25.4 thickness Length (Mtrs) Number of welds: Length of not backfilled sections (mtrs) Number of welds: Length of not backfilled sections (mtrs)

This is to certify that all welds of the above test section have been accepted and the pipe line section has been laid and back filled according to specifications.

Remarks:

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Signature Name Date Contractor Page 42 of 56

REAL East-west Gas Pipeline Project Construction Procedure for Cleaning, Gauging And Hydro testing of Pipelines Rev.: A1 China Petroleum Pipeline Bureau(CPP) Document No.: EWPL00-COS-PR-0014 Annexure:Air Cleaning Of Section To Be Hydrotested Section: Joint no from __________________ To ______________________ OD (mm) Wall Thk ( mm) Min: Max: Min: ID (mm) Max: Material: X70 Length (Kms) Volume (M) 3API 5L Gr Pigging direction from _________________________

Run no. Pig type Start Date time Date Km__________________________ to Km

End time Avg. Velocity Pressure (Bar) (km/ Hr) Min Max Quantity of debris

Reamrks:___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Signature Name Date

Page 43 of 56

Contractor REAL Other East-west Gas Pipeline Project Construction Procedure for Cleaning, Gauging And Hydro testing of Pipelines Rev.: A1 China Petroleum Pipeline Bureau(CPP) Document No.: EWPL00-COS-PR-0014 Annexure:Pipeline Gauging Acceptance Certificate Section: Joint no from __________________ To ______________________ Joint no. from: _______________ To __________________ Min Internal Pipe Diameter (mm) Direction of pigging:

Gauge plate Material Thk Dia Start Dt Time End Dt Time Avg velocity Pressure (Km/ hr) Min Max

Note:

1. Enclosed photograph of gauge plate after run

2. Condition of gauge plate after gauge run _____________________________ 3. Acceptance of gauge run: (Yes/ no) ______________

Signature Name Date Contractor REAL Page 44 of 56

Other


Procedure for Cleaning,Flushing,Gauging an.doc 将本文的Word文档下载到电脑
搜索更多关于: Procedure for Cleaning,Flushin 的文档
相关推荐
相关阅读
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 10

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xuecool-com QQ:370150219