there any movable or deformed, and mend in time if needed. It is also imperative to frequently check the crane hook, and see if the bolts and nuts are loose between the slant supports and the platform. Timely removal is needed if any happens.

5.2.2.4ÔÚ֧ģʱÏÖ½½¸Ö½îíÅÁº,°å,µ±¿ç¶ÈµÈÓÚ»ò´óÓÚ4Mʱ, Ä£°å¾ÍÆð¹°£»µ±Éè¼ÆÎÞ¾ßÌåÒªÇóʱ£¬Æð¹°¸ß¶ÈÒËΪȫ¿ç³¤¶ÈµÄÈ·1/1000-3/3000¡£When making the form work for RCC beam and slabs and their spans are more than 4 meters, the arch shall be made. If there is no specific requirement, the height of the arch shall be 1/1000-1/3000 length of the span.

5.2.2.5²ðģʱ²»µÃʹÓô󴸻òÓ²ÇËÂÒµ·,Èç¹û²ð³ýÀ§ÄÑ,¿ÉÓÃÇ˸ܴӵײ¿Çá΢ÇÁ¶¯;±£³ÖÆðµõʱģ°åÓëǽÌåµÄ¾àÀë,±£Ö¤íűíÃæ¼°Àâ½Ç²»Òò²ð³ýÊÜË𻵡£When removing the form, neither big hammer is used nor other unreasonable ways. If it is difficult to remove the form, claw bar may be applied gently at the bottom. Proper distances shall be maintained between the form and the walls when lifting so as to ensure no breaks made to the concrete faces, edges and corners.

5.2.2.6Áº²àÄ£°åµÄ²ð³ýÒÔ²»ÆÆ»µÀâ½ÇΪ׼¡£ÎªÁË׼ȷµØÕÆÎÕ²ðģʱ¼ä£¬±ØÐëÁôÅZͬÌõ¼þÊԿ飬ÊÔ¿éÇ¿¶È´ïµ½1.2MPAʱ²ÅÔÊÐí²ðÄ£¡£Ê©¹¤ÖÐÒª»ýÀÛ²»Í¬Ç¿¶ÈµÈ¼¶µÄíÅ,²»Í¬Ë®Äà,ÔÚ²»Í¬ÆøÎÂÌõ¼þ϶೤ʱ¼ä´ïµ½1.2MPAµÄ¾­Ñé¡£When removing the side moulding board for beams, neither edges nor corners shall be broken. Concrete cubic for testing shall be kept with the same conditions to facilitate the removal of board at the correct time. The board shall not be removed until the cubic is as strong as 1.2MPA. Experiences to tell when 1.2MPA shall be gained during execution for different grades of concrete with various cement, on different temperatures and etc. Finally one can tell when to get 1.2MPA by his experiences.

Page 25 of 92

5.2.2.7Ä£°å²ð³ýºó,Á¢¼´¶ÔÄ£°åµÄ°åÃæ¼°·ì϶½øÐÐÈ«Ãæ³¹µ×ÇåÀí,±£Ö¤Ï´ÎʹÓò»³öÏÖճģÏÖÏó¡£Ä£°åʹÓúóÒª½øÐÐάÐÞÇåÀí,ÈçÄ£°åÇåÀí,±äÐεÄУÕý,Ä£°åÅä¼þµÄ¸ü»»µÈ¡£The surfaces and joints of the board shall be cleaned immediately after the removal to ensure no stick occur for the next casting. The board shall be repaired and cleaned after using. Remedies shall be made if any deform happens and parts shall be replaced, etc.

5.2.3¸Ö½î¹¤³ÌThe Reinforcement Steel Work

5.2.3.1¶Ô½ø³¡¸Ö½î±ØÐëÈÏÕæ¼ìÑé,¼ìÑéÄÚÈݰüÀ¨²é¶Ô±êÖ¾,Íâ¹Û¼ì²é,²¢°´ÏÖÐйú¼ÒÓйز¿Ãűê×¼µÄ¹æ¶¨³éÑù¸´ÊԺϸñºó·½¿ÉʹÓá£ÔÚ±£Ö¤Éè¼Æ¹æ¸ñ¼°Á¦Ñ§ÐÔÄܵÄÇé¿öÏÂ,¸Ö½î±íÃæ±ØÐëÇå½àÎÞËðÉË,²»µÃ´øÓпÅÁ£×´»òƬ״ÌúÐâ¡¢ÁÑÎÆ¡¢Ç¿°Ì¡¢ÕÛµþ¡¢ÓÍ×ÕºÍÆáÎ۵ȣ¬¸Ö½î¶ËÍ·±£Ö¤Æ½Ö±£¬ÎÞÍäÇú¡£¶Ô¾­µ÷Ö±´¦Àí¸Ö½î¼Ó¹¿½îµÈ,Ó¦´îÉèÅï¼Ü,¼¯ÖÐÂë·Å,·ÀÓêÁÜÐâÊ´¡£ÆäËü¸Ö½îÓ¦¼Ü¿Õ·Ö¹æ¸ñÂë·Å,Æä¼Ü¿Õ¸ß¶È²»Ð¡ÓÚ10CM¡£It is a must to check and test the reinforcement steel brought into site. The checking shall be made including: to check its marks, outlook and take random samples to be tested as per the present state standards. The steel can only be used until the check is ok. The surface of the steel shall be clean and no damage on the conditions that the specifications and mechanics are ensured. Besides, there shall be no rust, no scales, no cracks, no collapse, no paint, no oil and etc. The end of the steel bar shall be straight and even without any bend. The hut shall be set up for those steel bars already straightened or bound with stirrups, and pile them up to avoid from rain and becoming rusted. The other steel bars shall be kept as per their diameters and be supported with the bottom height no less than 10cm.

5.2.3.2¸Ö½îÔÚ¼Ó¹¤Ç°Ó¦½à¾»,ÎÞËðÉË,ÓÍ×Õ,ÆáÎÛºÍÌúÐâµÈÓ¦ÔÚʹÓÃǰÇåÀí¸É¾»¡£Before fabricating, the steel bars shall be cleaned without any damage. Paint stains and rust shall

Page 26 of 92

be cleaned up before using.

5.2.3.3Ϊ±£Ö¤¸Ö½î¼Ó¹¤ÐÎ×´,³ß´ç׼ȷ,¿ÉÖÆ×÷¸Ö½î¼Ó¹¤µÄ¶¨ÐÍ¿¨¾ß¿ØÖƸֽî³ß´ç¡£In order to ensure the correct dimensions of the steel work, special tools like clamps can be made to control the same.

5.2.3.4Ê©¹¤ÖиֽîµÄ°óÔú½ÓͷλÅZÓ¦Ï໥´í¿ª.´ÓÈÎÒ»°óÔú½ÓÍ·ÖÐÐÄÖÁ´î½Ó³¤¶ÈL1µÄ1.3±¶Çø¶Î·¶Î§ÄÚ,ÓаóÔú½ÓÍ·µÄÊÜÁ¦¸Ö½î½ØÃæÃæ»ýÕ¼ÊÜÁ¦¸Ö½î×ܽØÃæÃæ»ýµÄ°Ù·ÖÂÊ,Ó¦·ûºÏÒÔϹ涨:ÊÜÀ­Çø²»µÃ³¬¹ý50%¡£°óÔú½ÓÍ·ÖиֽîµÄºáÏò¾»¾àS²»Ó¦Ð¡ÓÚÖ±¾¶DÇÒ²»Ó¦Ð¡ÓÚ25mm¡£During execution, the binding joints shall be not in one line. The center of the joint to the overlap length (L1)shall be less than 1.3 L1. The percentage (the cross section of the steel bars under stress with binding joints be divided by the total cross section of the bars under stress) shall comply with the stipulation: the length under stress shall be less than 50%. S(net space) shall no be smaller than D (diameter) but not small than 25 mm.

5.2.3.5¶ÔµçÔüѹÁ¦º¸,ÆøÑ¹º¸Òª¼ì²é½ÓÍ·Íâ¹ÛÖÊÁ¿,°üÀ¨º¸¿ÚÍ»³ö±íÃæ¸ß¶È,ÍäÕ۽ǶÈ(²»´óÓÚ4»ò70/1000)ºÍÖáÏ߯«ÒƵÈÏîÄÚÈÝ,¸Ö½î½ÓÍ·Ò»¶¨ÒªÀ뿪¹Õµã¡Ý10D,²»×¼Î»ÓÚ¹¹¼þµÄ×î´óÍä¾à´¦¡£Ê©¹¤ÖÐÓÃÎ޳ݾ⽫¸Ö½î¶Ë¿ÚÇÐÆ½,ÏȺ¸¸ßλ½î,ºóº¸µÍλ½î¡£For welding, it is imperative to check the joint¡¯s outlook, the joint itself, the bent angle(no greater than 4 or 70/1000) and the axis deviation. The joint shall be away from the inflexion (greater or equal to 10D). During execution, cut the bar end even, first weld the high level bars and then the lower ones.

5.2.3.6¸Ö½î±£»¤²ãºñ¶ÈThe Concrete Cover£º¸Ö½î±£»¤²ã³ß´ç¿ØÖÆÊÇ·ñ׼ȷ¼°¸Ö½îλÅZÊÇ·ñÂú×ãÉè¼ÆÒªÇóÊÇ´´Óżì²éµÄÒ»ÏîÖØµãÄÚÈÝ,Ò²ÊÇ´æÔÚÎÊÌâ½Ï¶àºÍ²»Ò׿ØÖƵÄÎÊÌâ,Ê©¹¤ÖÐÓ¦²ÉÓÃɰ½¬µæ¿é»òËÜÁϵæ¿é¿ØÖƱ£»¤²ãºñ¶È£¬¶ÔÓÚÖù×Ó¸Ö½îµÄ¶¨Î»Ò»°ã²ÉÓö¨Î»¿¨ÔÚ½½

Page 27 of 92

ÖþíÅǰ½«¶¨Î»¿¨Ì×ÔÚÖù½î¶¥¶Ë,Óðó¿Û½«Öù½î½ô¿¿ÔÚ¶¨Î»¿¨ÉÏ,¿ØÖƸֽî¼ä¾àλÅZ,ϲ¿ÓÃËÜÁϵæ¿é¿ØÖƱ£»¤²ãºñ¶È¡£The proper concrete cover and the location of the reinforcement steel shall be checked. It is the main checking for creating the first class quality work for many problems happened in this regard. Cement mortar and plastic spacers made of are used to control the concrete cover. The spacers are usually fixed on the top of the column reinforcement steel and at bottom, plastic ones, to control the concrete coverage.

5.2.3.7¸Ö½îÔÚ°óÔúʱעÒâ¼ä¾à¼°¸Ö½îµÄ¹æ¸ñ£¬¸Ö½î¼ä¾à£¬Ãª¹Ì³¤¶ÈÓ¦·ûºÏͼֽ¼°¹æ·¶ÒªÇó,¶ÔÓÚÐüÌô½á¹¹£¬¸Ö½îµÄ°Ú·ÅÓ¦ÕýÈ·¡£¸Ö½î±£»¤²ãºñ¶ÈÒª±£Ö¤£¬»¹Òª×¢Òâ²»µÃ©¿ÛÒÔ¼°°ó¿ÛË¿Ïòʱ£¬·ÀÖ¹ÆäÐâÊ´ÎÛȾíÅÍâ±íÃæ¡£When fabricating, attention shall be paid to the space between bars and their diameters. The anchor length shall comply with the requirements of drawings and the specifications. For those cantilever structures, the reinforcement steel hall be positioned properly and the concrete cover shall be ensured. No stirrups are missing and the end of the binding seams shall be bent inward to avoid the concrete surface from being stained and rusted.

5.2.4폤³ÌThe Concrete Work

5.2.4.1Ê©¹¤Ç°Ó¦½øÐÐíÅÅäºÏ±ÈÉè¼Æ,Ê×Ïȸù¾ÝÏÖ³¡Êµ¼ÊËùÓÃÔ­²ÄÁϵÄÐÔÄܼ°¶Ôíŵļ¼ÊõÒªÇó½øÐмÆËã,ÔÙ¾­ÊÔÑéÊÒÊÔÅä¼°µ÷Õû,¶¨³ö¼ÈÂú×ãÉè¼ÆºÍÊ©¹¤ÒªÇó,ÓÖ¾­½Ï¾­¼ÃºÏÀíµÄíÅÅäºÏ±È¡£µ±Ô­²ÄÁÏ·¢ÉúÏÔÖø±ä»¯Ê±,Ó¦ÖØÐ½øÐÐÅäºÏ±ÈÉè¼Æ¡£Ê©¹¤¹ý³ÌÖÐÑϽûËæÒâ¸Ä±äÅäºÏ±È¡£Before execution, the concrete mix ratio shall be designed. Based on the features of the materials at site and the technical requirements of the concrete, calculations shall be worked out and adjustments shall be made in the lab so as to obtain the proper concrete mix ratio which complies with the design and technical requirements for the execution and

Page 28 of 92


ÉϺ£Ä³°ì¹«Â¥¹¤³ÌÊ©¹¤×éÖ¯Éè¼Æ£¨ÖÐÓ¢ÎĶÔÕÕ£©.doc ½«±¾ÎĵÄWordÎĵµÏÂÔØµ½µçÄÔ
ËÑË÷¸ü¶à¹ØÓÚ£º ÉϺ£Ä³°ì¹«Â¥¹¤³ÌÊ©¹¤×éÖ¯Éè¼Æ£¨ÖÐÓ¢ÎĶÔÕÕ£© µÄÎĵµ
Ïà¹ØÍÆ¼ö
Ïà¹ØÔĶÁ
¡Á ÓοͿì½ÝÏÂÔØÍ¨µÀ£¨ÏÂÔØºó¿ÉÒÔ×ÔÓɸ´ÖƺÍÅŰ棩

ÏÂÔØ±¾ÎĵµÐèÒªÖ§¸¶ 10 Ôª

Ö§¸¶·½Ê½£º

¿ªÍ¨VIP°üÔ»áÔ± ÌØ¼Û£º29Ôª/ÔÂ

×¢£ºÏÂÔØÎĵµÓпÉÄÜ¡°Ö»ÓÐĿ¼»òÕßÄÚÈݲ»È«¡±µÈÇé¿ö£¬ÇëÏÂÔØÖ®Ç°×¢Òâ±æ±ð£¬Èç¹ûÄúÒѸ¶·ÑÇÒÎÞ·¨ÏÂÔØ»òÄÚÈÝÓÐÎÊÌ⣬ÇëÁªÏµÎÒÃÇЭÖúÄã´¦Àí¡£
΢ÐÅ£ºxuecool-com QQ£º370150219