(wancheng) 十、QAQC Plan 质量控制计划

2026/1/20 11:46:50

Project Name: DSM Zealand Project

Project No.: 418921300-31 Inquiry No. :

Visual (3)Motor casing earthing 电机外壳接地 Observation 观察 Inspection (4)Motor commissioning 电机试运转 Record 检查记录 Electric 8 Procedure Test 电气程序试验 Operation according to electrical diagram procedure 按电气原理图程序动作。 Visual Observation 观察 Visual Electrical 9 Receiving 受电 (2)Operation as per electrical receiving plan procedure 按受力方案程序进行操作。 (1)Inspection before electrical receiving 受电前检查; Observation 观察 Inspection Record 检查记录 Inspection Record 检查记录 Visual (2)Lighting normal to be in accordance with design requirement 照明正常,符合设计。 Observation and Inspection Record 观察检查记录 A R A R C R C R A (1)Correct loop to be in accordance with design requirement 回路正确,符合设计; 10 Lighting Test 照明试验 A R Bidder: China National Nanhai Engineering Co., Ltd. 49

Project Name: DSM Zealand Project

Project No.: 418921300-31 Inquiry No. :

Visual (1)Wiring 布线; Observation 观察 Visual (2)Loudspeaker, telephone installation 喇叭、电话安装; Telephone/PaObservation 观察 Visual (3)Controller installation 控制器安装 Observation 观察 Visual Observation (4)System test, function normal 系统试验功能正常。 and Inspection Record 观察检查记录 Visual (1)Wiring 布线; Observation 观察 Fire Alarm Visual (2)Detector installation 探测器安装; Observation 观察 Visual (3)Controller installation 控制器安装 Observation 观察 C C C A R C R C R C R 11 ging System 电话/传呼系统 12 System 火灾报警系统 Bidder: China National Nanhai Engineering Co., Ltd. 50


(wancheng) 十、QAQC Plan 质量控制计划.doc 将本文的Word文档下载到电脑
搜索更多关于: (wancheng) 十、QAQC Plan 质量控制计划 的文档
相关推荐
相关阅读
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 10

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xuecool-com QQ:370150219